Home > > Real, Unfiltered Moments from GA Interiors’ Yorkshire Three Peaks Challenge
At GA Interiors, we’re proud of the work we do every day on construction sites, but recently, our team took on a very different kind of challenge – the Yorkshire Three Peaks Challenge, to support Age UK Merton.
It was all about pushing ourselves, working as a team, and raising funds for a cause close to our hearts. The photos we’re sharing are real and unfiltered: sweaty faces, tired legs, and everyone giving their absolute best.
We’ll admit, not all of us managed to complete all three peaks within the 12-hour target. But that didn’t matter. What mattered was the spirit, effort, and camaraderie of the team. Every step, every climb, and every cheer along the way showed what GA Interiors stands for – dedication, teamwork, and community.
It’s not too late to join us in supporting Age UK Merton. Every donation helps them continue their invaluable work in the community. If you’d like to contribute, please donate today and help make a difference.
Home > > GA Interiors & Barnes Construction: Stratford Travelodge
Ladies and gentlemen, Stratford is changing. And GA Interiors is right at the centre of it.
Working alongside Barnes Construction, we are transforming Gredley House at 1–11 Broadway into a 151-room Travelodge hotel. This will be Travelodge’s closest hotel to Stratford Station – connecting seamlessly with National Rail, Underground and DLR. Built to BREEAM Excellent standard, it will showcase the group’s new premium look, complete with a modern bar café designed for today’s traveller.
Barnes Construction’s record speaks for itself: over three decades, 47 projects and 3,800 rooms delivered for Travelodge. Stratford marks London hotel number 85 – and together, we’re raising the bar once again.
The GA Interiors Contribution
Inside this landmark development, GA Interiors is delivering the complete interior fit-out:
- Steel encasements
- Ceilings
- Internal walls
- Finishing touches
This is a project with tight logistics, a demanding programme, and uncompromising standards. Every challenge has been met with precision, clear communication, and a shared commitment to quality.
Recognising the Team
Behind every great project stands a great team. Special thanks to:
- Tadas G.
- Arnas Antanavicius
- Samuel Gibson
- Gary Blake from Barnes Construction
- And the entire GA Interiors and Barnes Construction crew – onsite and behind the scenes – for their relentless dedication.
Building More Than a Hotel
This is not just another build. It is the revival of a vacant building, the regeneration of Stratford, and a benchmark for sustainable design in London hospitality.
At GA Interiors, we are proud to stand with Barnes Construction on a project that blends heritage, innovation, and excellence – shaping spaces that will serve Stratford and its visitors for decades to come.
Home > > GA Interiors at Vistry’s Charity Golf Day for Cancer Research UK
Our dream team – CEO, Head of Estimating, and QS, stepped out of the office and onto the course for Vistry Group’s Annual Charity Golf Day at Old Fold Manor Golf Club.
Event was all about raising money for Cancer Research UK (CRUK). An incredible cause, and one we were proud to be part of.
Big thank you to Vistry Group, one of our biggest clients and partners, for hosting such a brilliant event. We value the relationship we’ve built with you and look forward to many more years of working (and golfing) together.
Home > > Colliers Wood Project – Building Quality with Hill Group UK
Residential Development Project
On site at Colliers Wood, nearly 100 new apartments are taking shape across two modern buildings beside the River Wandle. This ambitious residential development demands precision, coordination, and trusted expertise, and GA Interiors is proud to play a key role in making it happen.
Our Scope of Works
GA Interiors is delivering the SFS framing, breather membranes, EPDM installation, firestopping, and full drylining package for this scheme, working in partnership with Hill Group UK as the main contractor. Each element of our package is vital in ensuring the buildings achieve the highest levels of performance, safety, and finish.
SFS Framing – providing the structural backbone for external walls.
Breather Membranes & EPDM – ensuring weather protection and long-term durability.
Firestopping – safeguarding residents with robust fire safety measures.
Drylining – achieving smooth, high-quality interiors ready for modern living.
A Team Effort
This project is not without its challenges. With a riverside location and a tight site footprint, every move on site counts. Careful planning, efficient logistics, and excellent communication are key to keeping the programme on track.
A big thank you goes to our Site Manager, Mihail Untila, and Contracts Manager, Tadas G, along with their dedicated team, for managing progress and driving quality at every stage. Their expertise, alongside the collaborative approach from Hill’s site team, ensures that momentum never stops, and the highest standards are maintained from frame to finish.
Partnership and Progress
At GA Interiors, we believe that projects are not just built on drawings, they’re built on people you can trust. Working side by side with Hill Group UK has been an absolute pleasure, proving once again that professionalism, collaboration, and shared commitment create the strongest results.
As this project advances, we look forward to delivering homes that will stand out for their quality and attention to detail – and to continuing our valued partnership with Hill Group UK.
Home > > GA Interiors Takes on the Yorkshire Three Peaks Challenge
GA Interiors team took on a Yorkshire Three Peaks challenge this past Saturday, 6th September. Scaling three mountains in just 12 hours to raise funds for Age UK Merton.
A charity dedicated to tackling social isolation among older people through vital services such as social care, welfare support, home assistance, and community centres.
Starting at 6am, our team of 18 people, tackled the Yorkshire Three Peaks: Pen-y-ghent, Whernside, and Ingleborough, covering a total distance of 24 miles (38.6 km). It was a tough but rewarding day.
A huge thank you to our director, Svajunas(Younis) L MsC ,MCIOB, who is always up for a challenge and inspires the entire team to do incredible things together.
This challenge was also part of our commitment to supporting Hill Group UK’s Social Values Action Plan, reflecting the importance of teamwork and giving back to community.
Your enthusiasm and generosity directly support Age UK Merton and their vital work in the community.
Home > > GA Interiors to Deliver Drylining and Plastering for Paradigm Housing’s £6.8M Project
We’re proud to announce that LIFE Build Solutions Limited has awarded us the drylining and plastering package for the exciting new Desborough Road development in High Wycombe, delivered for Paradigm Housing.
This £6.8M scheme will deliver 22 high-quality homes, including affordable rental and shared ownership properties, helping to meet local housing needs and supporting the growth of the community.
Our scope of works will include:
- Installation of internal partitions and noggins
- Application of plywood to internal wall areas
- Placement of insulation within joists
- Installation of plasterboard systems
- Closing up of ceilings and wall voids
- Full plastering works, including required drying periods
With works starting in October 2025, we’re set to apply our knowledge, attention to detail, and teamwork to ensure project success.
Proud to be partnering with Life Build Solutions on a scheme that will make a real difference in the local community.
Home > > GA Interiors Wins SFS Package for Innovative Two-Storey School Project
GA Interiors has been appointed to deliver the full SFS package for a new two-storey educational facility that will also include a modern sports hall. This specialist school will provide vital support for pupils with social, emotional, and mental health needs, creating a safe and nurturing environment that inspires a love of learning.
Our scope includes designing and installing a bespoke SFS solution with a unique insulation method to accommodate the building’s striking circular windows, ensuring thermal continuity and airtightness without compromising the architectural intent.
From a technical perspective, the project targets a BREEAM Excellent rating, with strict requirements for responsible sourcing, waste management, and energy efficiency. Prefabrication will also be used to improve quality control and speed up construction, aligning with the client’s net zero carbon ambitions.
This combination of sustainable design and precise engineering will not only deliver exceptional performance but also create a lasting, positive impact for the community.
Home > > Our team at Colliers Wood project
At Colliers Wood, we’re working for main contractor Hill Group UK, handling SFS framing, breather membranes, EPDM, firestopping, and full drylining. All of this takes place on a tight riverside site, where every move counts.
It’s challenging. It’s precise. It demands focus. But with the right people on site, it all comes together seamlessly.
Working with Hill Group has been an absolute pleasure. Professionalism, collaboration, and trust, when these come together, you see what a team can really achieve.
A massive thank you to site manager Mihail Untila and his incredible team. Skilled, dedicated, and always getting the job done right.
At GA Interiors, we know this: projects aren’t built by plans on paper. They’re built by people you can trust.
And we’re proud to have one of the strongest teams in the industry.
Home > > GA Interiors Selected for National Highways Maintenance Compound
Another important step forward for GA Interiors Ltd.
We’ve been selected to deliver the screeding and drylining packages on a new National Highways maintenance compound, a facility designed to keep the country’s roads safe, operational and resilient all year round.
Located in Swindon and operated by the Highways Agency (Department for Transport), the compound spans around 1,185 m². It may be modest in size, but it’s a hub of vital activity, supporting network resilience and emergency response.
Our aim in delivering drylining package is about creating durable, fire-safe walls and ceilings that perform under pressure and stand the test of time.
By delivering screeding we want to ensure strength, load-bearing capacity and long-term safety for the operational demands of heavy-use facilities.
We’re proud to contribute to projects that strengthen the road network and keep the people who maintain it safe.
Home > > Meridian 2 – Drylining package secured
We’re pleased to share a significant update from our work at Meridian 2, a landmark regeneration project transforming urban living, managed by main contractor Vistry Group.
Our team has been advancing steadily on site, delivering Steel Framing Systems, soffit insulation, and high quality welfare facilities, all helping to establish a robust foundation for this 274 home development.
GA Interiors Ltd has now been awarded the drylining package for the scheme.
This scope will be instrumental in shaping the interiors of the new homes, ensuring they meet the highest standards for quality, sustainability, and visual appeal.
Thank you to our dedicated GA Interiors team and to Vistry Group for their continued confidence in our ability to deliver exceptional work on large-scale regeneration projects.






















