Chiswick Travelodge

GA Interiors Ltd has completed the internal fit-out package for a six-storey, 113-bedroom Travelodge hotel in London’s Chiswick. Our scope included drylining, tape and jointing, MF and grid ceiling systems, fire protection works, and the coordination of prefabricated bathroom pod installations. All works were delivered in line with project specifications and regulatory standards, with a strong focus on accuracy, integration, and performance.

Home > Hotels > Chiswick Travelodge

Client: Barnes Construction

Sector: Hotel

Scope: Drylining, Tape and Jointing, Suspended Ceilings, Fire Protection Systems.

Location: 632 Chiswick High Road, W4 5RY

GA Interiors Ltd carried out a package of internal fit-out works as part of the new Travelodge development in Chiswick. The scope included drylining, tape and jointing, suspended ceilings, and fire protection systems, all delivered in line with current building regulations and project specifications.

The drylining works involved the construction of party walls designed to meet acoustic separation and fire resistance requirements. These partitions were built using systems specified to ensure compliance with performance criteria related to both sound insulation and fire containment.

An MF-suspended ceiling system was installed in accordance with Hadley’s design details, providing a streamlined ceiling finish while accommodating mechanical and electrical services above. A suspended grid ceiling was also installed in selected areas, offering practical access for future maintenance.

Fire protection measures included the encasement of structural steel elements using systems approved by British Gypsum. These installations were executed to achieve the required fire-resistance ratings, supporting the overall fire strategy for the building.

Prefabricated bathroom pods were coordinated and installed within the structural framework. Accurate placement and alignment were essential to ensure integration with surrounding finishes and connection to building services.

Tape and jointing works were completed across all plasterboard surfaces to achieve a smooth, continuous finish, suitable for subsequent decoration and final handover.

This package of works was delivered with an emphasis on compliance, accuracy, and coordination across trades.